Browsing 1 USN ansatte by Subject "Re-boiler duty"
Now showing items 1-1 of 1
-
Optimized carbon dioxide removal model for gas fired power plant
(Journal article; Peer reviewed, 2012)The carbon capture process model was developed for 500MW gas-fired power plant flue gas treating. Three different efficiencies, 85%, 90%, and 95%, were used to implement the model in Aspen Plus. The electrolyte NRTL rate ...